Complete line test before shipment

Post: 2021-05-26
For cap compression line, besides compression machine, there are also necessary downstream equipments, like cap cooler, cap slitter and cap folder. Kronce is not only take responsibility for each item’s quality in the line, but also must ensure our client to run the line easily. So, before shipment, all lines will be installed in our plant to have strict test inline. Necessary videos and photos will be taken during the test. Also, stickers with code number will be put on equipment’s each connecting position. From Kronce, the client can receive a really plug&play type cap compression production line and the installation process will be very simple.